Our software is designed to support complex development environments, enabling engineers to analyze and manage their systems models and requirements more efficiently. The tool for many solutions: Analysis, Lifecycle and Review of Models & Continuous Tracking of Model Changes.

qAnalytics enables agile MBSE

​Model Quality Management: Observe model quality at a glance, continuously.

Model Lifecycle Management: Track the lifecycle of relevant elements and plan your critical design reviews.

Change Management: Reveal model deviations immediately and assign changes (e.g. to Jira issues)​

A CI / CD Pipeline for MBSE: Advance your engineering with continuous feedback.

Use-Cases

A CI / CD pipeline for MBSE

Digital integration relies on the quality of elements that are brought together in a pipeline to:

    • Advance your engineering with continuous feedback

    • Monitor quality at every stage

    • Deliver (RE) documents – continuously, automatically ​

In this way you find errors earlier and improve your digital engineering.

Control all changes in your digital integration pipeline

qAnalytics provides you with all relevant metrics to monitor artifacts across tools, to:
  • Stay ahead of every model change

  • Reveal model deviations immediately, before they spread

  • Assign changes to Jira issues

This creates transparency across tools and makes deviations visible.

Track the lifecycle of relevant integration elements

qAnalytics provides an easy-to-use lifecycle tracking mechanism, to

  • Track the lifecycle of relevant integration elements

  • Plan your critical design reviews with ensured model quality

  • Act with reviews of dedicated problematic elements

This enables a better and more efficient planning of development milestones and reduces the amount of rework.

Model Quality at a glance

qAnalytics provides Model Quality information at a glance, to:
  • Observe model quality at a glance, clearly, continuously

  • Detect early – Spot errors instantly and assign reviews

  • Improve faster – Keep your integration pipeline error-free

qAnalytics provides each user with a personalized overviews to keep track of its contributions and their quality. ​This fastens integration and improves the overall quality.

Benefits

Higher Model Quality and Reliability | 01

  • Continuous quality monitoring allows teams to detect and correct issues early, reducing defects and rework.

  • Automated error detection and review assignments ensure that quality assurance happens proactively, not reactively.

  • Result: More reliable models, fewer downstream integration issues, and stronger confidence in system design outcomes.

Greater Efficiency and faster Delivery | 02

  •  With CI/CD for MBSE, model validation, documentation, and quality checks occur continuously.

  • Teams spend less time on manual verification and more time on innovation and design improvement.

  • Result: Shorter development cycles, faster integration, and an error-free delivery for critical design reviews.

Improved Collaboration & Traceability | 03

  • Model Lifecycle and Change Management capabilities make it easy to track who changed what, when, and why.

  • Integration with Jira connects engineering changes directly to tasks and reviews, ensuring full traceability.

  • Result: Better team alignment, transparent accountability, and simplified compliance and audits.